After extensive cruising in the Carribean, the vessel was hauled
and inspected in San Francisco. Seams were reefed and re-caulked.
Worm shoe was inspected and repaired.
Ten gallons of bottom paint was applied and topsides painted.
Ship is hauled and inspected yearly.